A 34-kilometre stretch of Highway 15 will receive some much-needed repairs this summer.
The section of highway, from PR 206 near Dugald to the Brokenhead River, will consist of shoulder paving from Dugald to Anola at PTH 12.
“This is a heavily travelled area serving several growing communities, and we want to ensure a safe and smooth ride,” said Infrastructure Minister Ron Schuler.
Shoulders for the remainder of PTH 15 east to Brokenhead River will be partially paved (0.8 m width paved and remaining 1.2 m gravel).
An open tender for the roadwork will be issued later this month, with construction to commence this summer.
Weather permitting, the project is expected to be completed by fall 2019.