
Manitoba Transportation and Infrastructure has closed the bridge over the Morris River on Provincial Trunk Highway (PTH) 3 near Brunkild until further notice. (HANDOUT)
Manitoba Transportation and Infrastructure has shut down the bridge over the Morris River on Provincial Trunk Highway (PTH) 3 near Brunkild due to structural instability.
Both directions of traffic are closed, with a detour in place via PTH 13 and PTH 2. The province says plans are underway to replace the bridge.
Drivers can find updated information on detours, restrictions, and closures at manitoba511.ca or by calling 511.





